가격표 3 상 와이어 4 코어 70mm 95mm 150mm 공중 ABC 케이블 말레이시아 0.6/ 1kv

가격표 3 상 와이어 4 코어 70mm 95mm 150mm 공중 ABC 케이블 말레이시아 0.6/ 1kv
항구: Qingdao,China
결제 조건: L/C,T/T,Western Union,MoneyGram
공급 능력: 50000000 미터 당 Month
원래 장소: Henan 중국
유명 상표: ZMS
모델 번호: 공중 번들 케이블
절연재: XLPE
유형: 낮은 전압
신청: 머리 위
지휘자 물자: 알루미늄
재킷: XLPE
제품 이름: 공중 번들 케이블
도체: 알루미늄
유형: 저전압, 듀플렉스 트리플 사중
인증서: ISO9001
표준: BS IEC ASTM DIN
브랜드: ZMS
크기: 1.5 ~ 600mm2
MOQ: 500 미터
샘플: 제공
패키지: 강철 나무 드럼 나무 드럼
포장 상세 정보: 포장 코일 또는 드럼, 오버 헤드 케이블 알루미늄/XLPE 절연 AAC triplex 공중 abc 케이블
Product Description

 

 

0.6/1kV Aerial Bundle Cable (ABC cable) is a very innovative concept for overhead power distribution as compared to the conventional bare conductor overhead cable.

 

1. 0.6/1kV Overhead Cable

2. Aluminum conductor

3. XLPE /PE Insulation

4. Phase conductor+ neutral Conductor

5. IEC ICEA NFC Standard

LV Aerial Bundled Conductor (ABC) Cables

  

Detailed Images

 

Related Products

Related Products

 

Medium Voltage ABC Cable LV Copper Power Cable Bare Conductor ACSR
Aerial Bundled Cable with IEC60520 Standard 0.6/1kV overhead aerial bundled cable LV Armored Power Cable

 

Packaging & Shipping

 

Certifications

 

FAQ
  1. Q: Is your company a factory or trading company?

    A: We are factory with our own trading company. Our trade business expands home and abroad.

  2. Q:When can I get the price?

    A:We usually quote within 12 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your e-mail so that we will regard your inquiry priority.

  3. Q:How can I get a sample to check your quality?

    A:After price confirmation, you can require for samples to check our quality. Sample is free, but the freight charge should be paid.

  4. Q: What is Minimum Order Quantity?

    A: Generally, 1000 meters for building wire. For power cable, armored or unarmored, 500 meters.

  5. Q: Which standards for your products?

    A: We can produce wire and cable according to international standards: IEC, ASTM, BS, DIN, SANS, CSA or as customers’ requirement.

  6. Q: How about delivery time?

    A: If we have stock, delivery would be very quick. For the newly-produced products, 15 to 25 days for production.

  7. Q: Payment terms:

    A: Normally 30% paid as prepayment, balance paid before delivery. Or 100% L/C at sight.

  8. Q: What is your packing?

    A: Our electrical cable is using electrical cable wheel for the packing, the wheel can be all steel, steel frame and fumigated wood, or fumigated wooden cases. We are using different packing for different length of the cable, to ensure there will be no problem during the delivery of the products.

Tags: , ,

Contact us

 

 

 

찾다